The Biggest Slag Heap in the World
Use No 29
West Cumbria is famous for being the place where you can find the World's Biggest Liar. Now the Department of Energy and Climate Change are pushing for West Cumbria to be the place where you can find the World's Biggest Slag Heap.
Nominations are already coming in for what this huge slag heap, ripped out of Lakeland geology, could be called:
Robson's Pile
Partnership Peaks (not forgetting the Partnership Pit!)
Teardrops o' Ruskin
Tremor Towers
Seismic Surprise
or perhaps "The Bung" ?
http://www.santonbridgeinn.com/liar/
http://davidsmythe.org/nuclear/nuclear.htm
http://www.opendemocracy.net/ourkingdom/michael-baron/public-servants-and-private-chats-about-dumping-nuclear-waste-in-west-cumbr
Below is a letter to Cumbria County Council from geoscientist Professor David Smythe
Sent to CCC by email – 6th Oct 2011
Dear Mr Kemp
I have just sent off a new paper to MRWS:Cumbria regarding the
unsuitability of the Eskdale granite as a host rock for a waste
repository, and attach a copy for your attention. It includes some
comments on the volumes of rock spoil to be created and then either
re-used later as backfill and/or taken off-site.
I believe that the letter you received from Mark Gough of NDA, dated
19 May 2011, is misleading on this point. Here are some
calculations, based upon the volumes of 'higher strength' rock spoil
which would be created.
The volume to be removed (if not left in Eskdale) is 6640921 cu. m.
(from ref. [5] of my paper). That is based on the volume of space to
be created underground, and therefore refers to solid rock. This
volume could be stored as a berm 1000 m long by 200 m across and 35
m high. Actually it will be about 50% greater in volume (e.g. 50 m
not 35 m high) because rock spoil is less dense than solid granite.
The NDA clearly can't leave that in Eskdale (along with the
additional rock spoil berms of about half this volume again) to
remain for up to 50 years and then re-used as backfill). NDA will
presumably ship it out - granite cuttings do have a value as
aggregate. But we have to address the road and rail usage of
removing it.
Multiply the volume by the density of solid granite (2.7 tonnes per
cu. m) to get the weight. That makes 17930487 tonnes. A road lorry
has a 44 tonne capacity, so that makes 407511 loads. Spread over 10
years (a maximum figure for the excavation phase), that means 112
loads per day - or a lorryload every 4 minutes during a working day
of 8 hours, every day of the week, for 10 years. The road traffic is
clearly double that because the returning empty lorries have to be
counted as well.
This is completely at odds with the assurances you have been given
by NDA:
"we have assumed that all of the excavated rock spoil could be
stored on the surface and then either re-used in construction and
backfilling, or for landscaping and site restoration. Under this
scenario there would be no requirement to transport rock spoil
off-site."
Please note that similar figures will apply if the host rock is some
other kind of 'higher strength'or 'lower strength' rock. Note that
the evaporite scenario (the third generic host rock type) does not
apply to West Cumbria.
So is CCC going to permit this kind of long-term environmental
damage within the National Park?
I await your comments with interest.
Yours sincerely
David Smythe
Monday, 3 October 2011
Jollies
Use No 28
Jollies
Rather than spending taxpayer’s money on a jolly this week to see France's
research into geological dumping the DECC sponsored Managing Radioactive
Wastes Safely (!) Partnership should go for a walk up Scafell. A walk up
Scafell would give the Partnership a sense of the scale of DECC’s proposal
for a huge hole in the ground. Radiation Free Lakeland would be happy to
organise a day guiding members of the Partnership to the top of Scafell.
We would, of course, avoid the "Bad Step." We could then look down to
get some idea of the depth of the geological dump proposed - 1000 meters.
Scafell is a mere 978 meters.
In looking for a Cumbrian dump for intermediate level nuclear wastes,
Nirex found in the 1990s that the geology of the Lake District leads to
upward waterflows into the aquifer surrounding the mountains. The Inquiry
revealed difficulties in identifying a large volume of rock in West
Cumbria to avoid fast routes for radionuclide escape through watery
fractures and faults. A much larger volume of rock would be needed for the
plan for a dump containing spent nuclear fuel and high level wastes which
being hotter and more volatile must be spaced further apart.
Residents of Bure, France, are "embracing" that underground research
laboratory about as much as Nevada welcomed the now abandoned Yucca
Mountain nuclear dump. Bure's aquifers run through the proposed storage
site. Public opposition to nuclear power in France is rising because of
the waste problem.
Maybe there isn’t enough rock in the world to isolate high level nuclear
waste from humans and the environment into eternity? No where in the world
has done this. Maybe it is more honest to say there is no ‘solution’ and
to just stop producing high level nuclear wastes? Certainly this
Partnership 'process' should be scrapped now before more public money is
spent on “steps towards” a worlds first, high level nuclear waste
geological dump,- located somewhere as yet unspecified (for DECC's sake
don't scare the horses!) in West Cumbria.
http://www.cumbriacrack.com/2011/09/29/fact-finding-repository-visit-for-west-cumbria-managing-radioactive-waste-safety-partnership-members/
http://www.greenpeace.de/fileadmin/gpd/user_upload/themen/atomkraft/GPI_nucl_waste_crisis_in_France_briefing_30may06.pdf
Subscribe to:
Posts (Atom)